Cooling Tower Fill Replacement Procedure

Cooling Tower Fill Replacement Procedure

Due to hot summer arrival, large cooling towers, central air conditioning have gone into the overload operation situation, Therefore,the timely replacement of cooling tower fill packing is more essential for cooling effect and the cooling tower life. Do remember to regularly check the cooling tower, replace the ragged or broken cooling tower fills in time.

SINTAFRP is with rich experience in the cooling tower fill packing replacement, cooling tower maintenance and other fields. Now we summarized main steps as follows for reference, to facilitate more cooling tower users learn to use:

1.To protect, isolate and list other equipment on site before construction;Laying construction materials cloth for floor waterproof layer to prevent damage;

2.Remove old cooling tower packing and turn off motor power. Remove the bracing of the filling part of cooling tower;Remove old stuffing; Doing garbage disposal in the tower;Cleaning the site.

3.Cooling tower fill adhesive into blocks; ensure that the fill sheets in the binder has enough space to put during curing. and all the filling gluing points at the same level, ensure that in the process of pressure welding filler to receive strength evenly in close contact point;

4.Cleaning dust garbage on cooling tower internal parts, ensure clean, stamping of structured packing in cooling tower pattern, and it is strictly prohibited in the process of pattern tread and vigorously squeeze packing, ensure every crib filler piece of neat, tight packing and corner pieces in place on each floor, column weeks for seamless and restore cooling tower packing parts brace;

5.When installing, pay attention to the upper and lower directions of the assembly block, the top of each layer should be laid flat, clean and clean between floors, and no debris should be blocked.

6.Installation, maintenance and other work must be carried on a flat plate when the packing is done. Direct trample is strictly prohibited.

7.In the process of construction, assembly and installation, it is strictly forbidden to do welding operation on the top of the cooling tower, and fire prevention measures should be taken when necessary.installed

8.In the process of construction, assembly and installation, it is strictly forbidden to do welding operation on the top of the cooling tower, and fire prevention measures should be taken when necessary.After installation, all construction tools and auxiliary installation facilities in the cooling tower will be transferred to the construction completion plan, waiting for acceptance, the whole cooling tower filling replacement step is completed.

Welcome to contact us for different cooling tower fill replacement!