Kuken Cooling Tower Packing Finished

Kuken Cooling Tower Packing Finished One client ordered Kuken cooling tower fill from us, and for all fill, we can supply for clients by loose sheets and glued module, according to clients’ requirement. Lead time for cooling tower cargo about 10-15days, for normal sheet thickness, and if clients need thicker s...

Read more

Cross-flow cooling tower fill

Kuken Cooling tower infill with 730mm,750mm width Cross-flow cooling tower fill Name: PVC fill for cooling tower Type: Cooling Tower Parts Unit: PC Material: PVC Usage: For industrial cooling tower Temperature suitable 60 degree C-35 degreeC Color Carbon black, grey, etc Shaping mode Plastic extrusi...

Read more

Tube settler for water treatment

Tube settler for water treatment Sinta could supply tube settler for water treatment, the material could be made by PP.PVC or fiberglass. The tube settler color is normally white for PP,Black,blue for PVC, light green for FRP material. And the normal sheet size is as 1000*1000mm, sheet thickness could be 0.5-0.9mm; ...

Read more